1 Minute Read
| Overview
Vacation Schedule is similar to building schedule, but unlike a building schedule its just a schedule day or a date range schedule, it tells the system that the building is on a vacation, and the Building HVAC needs that is required is not the same as in a building schedule, and the system can operate in a setback or unoccupied mode, where usually the desired temperatures are much relaxed than the scheduled duration or setpoint mode.
| Accessing Vacation Schedule
From CCU Zones page.
- Click Building
The Building schedule screen is displayed with the vacation schedule section.
| Setting Vacation Schedule
To set a new entry for Vacation Schedule
- Click Add Entry+ next to vacations.
The add vacation window is displayed.
- Enter a name of the vacation.
- Select a date or a date range you wish to set the vacation for.
- Click Save to confirm and create the vacation schedule for the building.
Note: You can also edit an Building vacation to new vacation, by simply clicking, modifying the date or date range.
Once a Building Vacation is added in the CCU the same gets cascaded to the other CCU's and the portals.
Comments
0 comments
Please sign in to leave a comment.