Logo
75F Website Sign in
  • Home
  • Categories
  • Submit a request
  • Community
  1. 75F Renatus
  2. Getting Started
  3. FAQs

FAQs

  • What does the color coding of my heatmap mean?
  • I put in an Organization during registration, what is that used for?
  • Where do I buy 75F?
  • How many zones can I pair to a CCU?
  • What's the difference between Conditioning and Operation mode?
  • Can I rename a floor from Facilisight?
  • Can I rename a zone from Facilisight?
  • What is a Ref?
  • What is a tag?
  • Why is a zone reporting data but the zone is dead?
  • What does 'Analytics Last Update time' mean?
  • Can I change the color coding of the heatmap?
  • Why am I not receiving text notifications?
  • I feel like I'm getting a lot of alert noise. What do I do?
  • Can I change the order of my floors on the heatmap?
  • Can I change the order of my CCUs?
  • What is a Vacation?
  • If I edit building schedule from a CCU, does it sync to other CCUs?
  • What does High priority mean?
  • How is zone priority calculated in DAB?
  • Why is my VAV damper not opening for more reheat?
  • What does the green dot on my zone mean?
  • How do I login? I never received a welcome email
  • How do I know if my system is cooling?
  • How do I know if my system is heating?

Here's something you can look for

Overlapping User limits for Heating and Cooling, Effects of Schedule States in the Building, Schedule States Enhancements, IAQ parameters visibility and setting enhancements from CCU, 7-day special schedule, and 24-Hour scheduling

See more
Logo

The Future of Control, Today

Copyright © 2022 All Rights Reserved.
Powered by Zendesk